Finished routing. Still one airwire left. :( These two points need to be
authorChristoph Mair <christoph.mair@gmail.com>
Sun, 30 Aug 2009 19:56:08 +0000 (21:56 +0200)
committerChristoph Mair <christoph.mair@gmail.com>
Sun, 30 Aug 2009 19:56:08 +0000 (21:56 +0200)
commit1380dc99d16571af754c21bb0e579fd9bb661ddb
tree42d4de2492dfa75e57958207731b6ae49c467cb8
parentd770808d4f173fee68eaebe3351078e545188b50
Finished routing. Still one airwire left. :( These two points need to be
connected with a thin wire.
src/gyro-V5.brd
src/gyro-V5.sch